04 concrete drain channels were constructed at two different sections of the facility. Laying of bitumen road work was completed …
04 concrete drain channels were constructed at two different sections of the facility. Laying of bitumen road work was completed …
Construction of washrooms (03), shower rooms (03) and locker room Tile finish floor and precast slab roof
Complete overhauling of Hydraulic setup Calibration of gauges Calibration of Depth Counter and Load Cell Complete Diesel engine overhauling Complete …
Structure and Process Designing of ETP Construction of ETP Procurement of Chemical and Fine bubble diffusers Commissioning of ETP
Interior designing and renovation of cafeteriaat City court Karachi. Gypsum false ceiling designing and installation PVC panel installation, Flooring, Polishing, …